Marriott Doha Marina – Surveying & Inspection

Client: Marriott Doha Hotel Notes: Survey Report & Evalaution Date: Feb, 2021 Status: DONE Surveying, Inspection and Evaluation Marriott Doha Hotel appointed PDCQATAR Marine to run a full survey for the hotel’s marina and provide them with our professional inspection and survey report with recommendation and evaluation. The Survey included: – Piles conditions and corrosion. […]

View details
Marriott Doha Marina – Surveying & Inspection

Private Client Sh. M. A. Althani – Repair & Maintenance

Client: Sh. M. A. Al Thani Certificate of Completion: 2020/1005 Date: Mar, 2020 Status: DONE Repair & Maintenance to Dock The Client’s marina suffered many broken and damaged connections. PDCQATAR Marine being the exclusive dealer for EZDock attended to a full repair and maintenance to the floating dock and replace all damaged connections. Related Projects […]

View details
Private Client Sh. M. A. Althani – Repair & Maintenance

Ritz Carlton Marina – Surveying & Inspection

Previous Next Client: Ritz Carlton Doha Hotel Notes: Survey Report & Evalaution Date: July, 2019 Status: DONE Surveying, Inspection and Evaluation Ritz Carlton appointed PDCQATAR Marine to run a full survey for the hotel’s marina and provide them with our professional inspection and survey report with recommendation and evaluation. The Survey included: – Piles conditions […]

View details
Ritz Carlton Marina – Surveying & Inspection

Private Client Sh. A. AlThani – Re-Anchor

Client: Sh. A. Al Thani Certificate of Completion: 2018/1003 Date: Nov, 2018 Status: DONE Re-Anchor and Piling PDCQATAR Marine was contracted to re-anchor and pile driving the client’s marina. The client’s marina had damaged anchorage and no piles to the marina at the time of installation. The scope of work was to pile drive 4 […]

View details
Private Client Sh. A. AlThani – Re-Anchor

Private Client M. Abu Issa Re-Anchor

Client: M. Abu Issa Certificate of Completion: 2019/1003 Date: Feb, 2019 Status: DONE Re-Anchor Floating Dock PDCQATAR Marine was contracted to re-anchor the aluminum floating dock with new concrete deadweight sinkers and chains.  Deadweight sinkers 1.5ton each Galvanized Steel chains Related Projects Maintenance & Repair / Surveying Private Client Sh. A. AlThani – Re-Anchor Sed […]

View details
Private Client M. Abu Issa Re-Anchor

Four Seasons Marina – Surveying & Inspection

Previous Next Client: Four Seasons Hotel Doha Notes: Survey Report & Evalaution Date: Jan, 2019 Status: DONE Surveying, Inspection and Evaluation Four Seasons and The operator Mourjan Marinas appointed PDCQATAR Marine to run a full survey for the hotel’s marina and provide them with our professional inspection and survey report with recommendation and evaluation. The […]

View details
Four Seasons Marina – Surveying & Inspection

Private Client J. Al Jaber – Underwater Cleaning & Maintenance

Client: J. S. Al Jaber Certificate of Completion: 2019/1009 Date: Sep, 2019 Status: DONE Underwater Cleaning and Maintenance PDCQATAR Marine did an underwater cleaning for the client’s marina as well as general maintenance and replaced connection parts to stainless steel for longer durability and strength. Our team and scuba divers completed the underwater marina growth […]

View details
Private Client J. Al Jaber – Underwater Cleaning & Maintenance

Private Client A. A. AlThawadi – Maintenance & Underwater Cleaning

Client: A. A. Al Thawadi Certificate of Completion: 2020/1016 Date: Nov, 2020 Status: DONE Maintenance & Underwater Cleaning After our inspection and site surveying, supplying the client with a detailed and photo/video documented damages, marine growth and maintenance requirement for his personal floating dock. The client did not hesitate to sign a maintenance and cleaning […]

View details
Private Client A. A. AlThawadi – Maintenance & Underwater Cleaning

Lusail Mourjan Marina Re-Anchor

Clients: Mourjan Marinas Certificate of Completion: 2018/1001 Date: July, 2018 Status: DONE Lusail Marina – ReAnchor Placement of deadweight sinkers to re-anchor the commercial marina of Lusail City operated by Mourjan Marinas. 13 deadweights (sinkers) with chains Each 2.5Ton Related Projects Maintenance & Repair Private Client Sh. A. AlThani – Re-Anchor Sed ut perspiciatis unde […]

View details
Lusail Mourjan Marina Re-Anchor

Lusail Mourjan Marina Repair & Maintenance

Clients: Mourjan Marinas Certificate of Completion: 2020/1014 Date: Sep, 2020 Status: DONE Lusail Marina – Repair & Fixation Repair and fix broken major connection in marina finger. PDCQATAR Marine manufactured a custome designed steel structure connection to replace the broken and damaged Aluminum frame. Related Projects Maintenance & Repair Private Client Sh. A. AlThani – […]

View details
Lusail Mourjan Marina Repair & Maintenance
×

Hello!

Click one of our representatives below to chat on WhatsApp or send us an email to marine@pdcqatar.com

× How can I help you?