









Clients: | Ministry of Municipality & Environment |
Notes: | Awarded Public Tender |
Date Completed: | June, 2020 |
Status: | Completed |
West Bay Lagoon 4 Marinas
PDCQATAR Marine was contract awarded for the Public Tender in 2019 to supply and install four (4) marinas at West Bay Lagoon area – Legtaifiya.
The project was based on HDPE Docks and Docks Accessories supplied by:
- Dock Sections: EZ Dock – USA
- Pedestals and SOS: Rolec – UK
- Solar Navigational Lights: G & S Lights
Each marina consist of
- 33m walkway with hand rails & 33m horizontal walkway
- 10 jet-ski ports with wheels.
- 8 boats berthing.
- 4 Service Pedestals.
- 1 Equipped SOS.
- 15 Navigational Solar Light.
Related projects
Marsa Malaz Kempinski – Sand Filling & Reprofiling
Clients: Marsa Malaz Kempsinski Certificate of Completion: 2019/1007 Date: August, 2019 Status: DONE Marsa Malaz Kempinski – Sand Filling & Reprofiling Marsa Malaz Kempinski, the pear similar to all hotels suffers from erosion. Where PDCQATAR Marine supplied the hotel with sand filling and reprofiling to have a smooth beach level. The operation took 4 workday […]
View details
Private Client J. S. Al Jaber – Floating Dock & Boat Lift
Client: A. S. Al Jaber Certificate of Completion: 2019/1009 Date: Sep, 2019 Status: DONE EZ Dock Floating Pontoon & Dry Berth PDCQATAR Marine installed EZDOCK floating pontoon with jet-ski ports and boatlift with two benches and solar deck lights. Moreover, the Australian well known dry berth brand (Air boat lift) was supplied and installed for […]
View details
The St. Regis – Sea Barrier WaveBreaker & Jellyfish Net
Previous Next Client: The St. Regis Doha Certificate of Completion: 2019/1010 Date: Nov, 2019 Status: DONE Wave Breaker Sea Barrier & Jellyfish Net PDCQATAR Marine supplied and installed its specialty wave breaker sea barrier with solar light and jellyfish net for The St. Regis Doha. Since the barrier was installed, the sand erosion was improved […]
View details