Clients: A. A. Al Darwish
Certificate of Completion: 2019/1002
Date: Feb, 2019
Status: DONE

Private Client - A. A. Al Darwish

Overcoming challenges

Supplying and installing HDPE floating cube dock and sitting area secured by handrails for a great gathering chill at sunset. 

This project had a great client’s feedback that leaded to an expansion and enlargement later in May 2019

  • HDPE floating cubes
  • Walkway length 18m and 2m width
  • Sitting area measures 3mX5m
  • Handrails on walkways sides and securing the sitting area.
  • LED lights (Red and Blue)

Related projects

Private Client I. Aldhaimi – Floating Dock

Client: I. Al Dhaimi Certificate of Completion: 2021/101 Date: Jan, 2021 Status: DONE Floating Dock with Ports and UW Lights The client had the confidence in PDCQATAR Marine to provide a turn-key solution to his small sized beach with pile of rocks blocking his waterway. PDCQATAR Marine had re-construct and shape and the rock piles […]

View details
Private Client I. Aldhaimi – Floating Dock

The St. Regis – Floating Dock Jetty & Gangway

Previous Next Client: The St. Regis Doha Certificate of Completion: 2020/1006 Date: May, 2020 Status: DONE Aluminum Floating Dock & Gangway PDCQATAR Marine supplied and installed for The St. Regis Doha an aluminum floating dock with WPC wood decking and gangway to replace their old floating dock.  The floating dock was strengthen with 2 stiff […]

View details
The St. Regis – Floating Dock Jetty & Gangway

Private Client J. Al Jaber – Floating Dock

Client: J. S. Al Jaber Certificate of Completion: 2020/1004 Date: March, 2020 Status: DONE Floating Dock – EZDOCK Expansion The client went through full major expansion of his previously installed floating dock by PDCQATAR Marine. The sitting area was enlarged to accommodate more benches and sizable space. Also added several of accessories that added more […]

View details
Private Client J. Al Jaber – Floating Dock

Private Client A. A. Al Darwish Expansion

Client: A. A. Al Darwish Certificate of Completion: 2019/1004 Date: May, 2019 Status: DONE Private Client – Floating Dock Expansion After installing the HDPE floating dock back in Feb 2019, the client enjoyed the sitting area and was happy with the quality and the experience. Decided in May to expand and enlarge the sitting area […]

View details
Private Client A. A. Al Darwish Expansion

Ministry of Municipality & Environment- Legtaifiya 4 Marinas

Client: Ministry of Municipality & Environment Notes: Awarded Public Tender Date Completed: June, 2020 Status: Completed West Bay Lagoon 4 Marinas PDCQATAR Marine was contract awarded for the Public Tender in 2019 to supply and install four (4) marinas at West Bay Lagoon area – Legtaifiya. The project was based on HDPE Docks and Docks […]

View details
Ministry of Municipality & Environment- Legtaifiya 4 Marinas

Private Client J. S. Al Jaber – Floating Dock & Boat Lift

Client: A. S. Al Jaber Certificate of Completion: 2019/1009 Date: Sep, 2019 Status: DONE EZ Dock Floating Pontoon & Dry Berth PDCQATAR Marine installed EZDOCK floating pontoon with jet-ski ports and boatlift with two benches and solar deck lights.  Moreover, the Australian well known dry berth brand (Air boat lift)  was supplied and installed for […]

View details
Private Client J. S. Al Jaber – Floating Dock & Boat Lift

Qatar Building Company New Floating Dock

Sed ut perspiciatis unde omnis iste nas error sit voluptatem accusantium doloremque laudantium, totam aperiam, eaque ipsa quae ab illo inventore veritatis et quasi architecto. Ut enim ad minima veniam, quis nostrum exercitationem ullam…

View details
Qatar Building Company New Floating Dock
× How can I help you? Available from 08:00 to 21:00