


Client: | Sh. A. Al Thani |
Certificate of Completion: | 2018/1003 |
Date: | Nov, 2018 |
Status: | DONE |
Re-Anchor and Piling
PDCQATAR Marine was contracted to re-anchor and pile driving the client’s marina.
The client’s marina had damaged anchorage and no piles to the marina at the time of installation. The scope of work was to pile drive 4 piles and re-anchor the marina.
Related projects
Ritz Carlton Marina – Surveying & Inspection
Previous Next Client: Ritz Carlton Doha Hotel Notes: Survey Report & Evalaution Date: July, 2019 Status: DONE Surveying, Inspection and Evaluation Ritz Carlton appointed PDCQATAR Marine to run a full survey for the hotel’s marina and provide them with our professional inspection and survey report with recommendation and evaluation. The Survey included: – Piles conditions […]
View details
Private Client Sh. A. AlThani – Re-Anchor
Client: Sh. A. Al Thani Certificate of Completion: 2018/1003 Date: Nov, 2018 Status: DONE Re-Anchor and Piling PDCQATAR Marine was contracted to re-anchor and pile driving the client’s marina. The client’s marina had damaged anchorage and no piles to the marina at the time of installation. The scope of work was to pile drive 4 […]
View details
Private Client M. Abu Issa Re-Anchor
Client: M. Abu Issa Certificate of Completion: 2019/1003 Date: Feb, 2019 Status: DONE Re-Anchor Floating Dock PDCQATAR Marine was contracted to re-anchor the aluminum floating dock with new concrete deadweight sinkers and chains. Deadweight sinkers 1.5ton each Galvanized Steel chains Related Projects Maintenance & Repair / Surveying Private Client Sh. A. AlThani – Re-Anchor Sed […]
View details
Private Client A. A. AlThawadi – Maintenance & Underwater Cleaning
Client: A. A. Al Thawadi Certificate of Completion: 2020/1016 Date: Nov, 2020 Status: DONE Maintenance & Underwater Cleaning After our inspection and site surveying, supplying the client with a detailed and photo/video documented damages, marine growth and maintenance requirement for his personal floating dock. The client did not hesitate to sign a maintenance and cleaning […]
View details
Lusail Mourjan Marina Re-Anchor
Clients: Mourjan Marinas Certificate of Completion: 2018/1001 Date: July, 2018 Status: DONE Lusail Marina – ReAnchor Placement of deadweight sinkers to re-anchor the commercial marina of Lusail City operated by Mourjan Marinas. 13 deadweights (sinkers) with chains Each 2.5Ton Related Projects Maintenance & Repair Private Client Sh. A. AlThani – Re-Anchor Sed ut perspiciatis unde […]
View details
Lusail Mourjan Marina Repair & Maintenance
Clients: Mourjan Marinas Certificate of Completion: 2020/1014 Date: Sep, 2020 Status: DONE Lusail Marina – Repair & Fixation Repair and fix broken major connection in marina finger. PDCQATAR Marine manufactured a custome designed steel structure connection to replace the broken and damaged Aluminum frame. Related Projects Maintenance & Repair Private Client Sh. A. AlThani – […]
View details