






















Client: | I. Al Dhaimi |
Certificate of Completion: | 2021/101 |
Date: | Jan, 2021 |
Status: | DONE |
Floating Dock with Ports and UW Lights
The client had the confidence in PDCQATAR Marine to provide a turn-key solution to his small sized beach with pile of rocks blocking his waterway.
PDCQATAR Marine had re-construct and shape and the rock piles to create a pathway to the client’s new floating dock walkway. with a jet-ski port, boatlift and 3 boats berths.
To compliment this piece of art, we provided the client with a service pedestal for his water and electricity needs, bench, storage box and underwater glowing lights.
- EZ Dock – USA Brand
- Walkway length 27m and 1.5 width
- Sitting area 3mX1.5m
- Ladder
- 1 jetski port
- 1 boatlift
- 3 boats berths
- 1 service pedestal with MEP work
- 3 underwater glow lights (American brand)
- handrails and marine rope
- Deck solar lights
Related projects
Marsa Malaz Kempinski – Underwater Lighting
Clients: Marsa Malaz Kempinski Certificate of Completion: 2019/1011 Date: November, 2019 Status: DONE Marsa Malaz Kempinski, The Pearl Supply & Install Underwater Lights PDCQATAR Marine supplied and installed five (5) underwater lighting with timer. Creating a stunning view at night for the surrounding restaurants and hotel’s guests gazing at the glowing sea. American Brand Underwater […]
View details
Private Client A. A. Al Darwish Boat Lift
Client: A. A. Al Darwish Certificate of Completion: 2020/1015 Date: Nov, 2020 Status: DONE Supply & Install a 7m Boatlift PDCQATAR Marine supplied and installed a 7m boat lift for our returned loyal client. The boat lift is made from HDPE cubes, rollers system for smooth entry and exit and manual winch. 7m length boat […]
View details
The St. Regis – Floating Dock Jetty & Gangway
Previous Next Client: The St. Regis Doha Certificate of Completion: 2020/1006 Date: May, 2020 Status: DONE Aluminum Floating Dock & Gangway PDCQATAR Marine supplied and installed for The St. Regis Doha an aluminum floating dock with WPC wood decking and gangway to replace their old floating dock. The floating dock was strengthen with 2 stiff […]
View details
Private Client J. Al Jaber – Floating Dock
Client: J. S. Al Jaber Certificate of Completion: 2020/1004 Date: March, 2020 Status: DONE Floating Dock – EZDOCK Expansion The client went through full major expansion of his previously installed floating dock by PDCQATAR Marine. The sitting area was enlarged to accommodate more benches and sizable space. Also added several of accessories that added more […]
View details
Private Client A. A. Al Darwish Expansion
Client: A. A. Al Darwish Certificate of Completion: 2019/1004 Date: May, 2019 Status: DONE Private Client – Floating Dock Expansion After installing the HDPE floating dock back in Feb 2019, the client enjoyed the sitting area and was happy with the quality and the experience. Decided in May to expand and enlarge the sitting area […]
View details
Private Client A. AlThawadi – Boatlift
Client: A. A. Al Thawadi Certificate of Completion: 2020/1017 Date: No, 2020 Status: DONE Supply & Install a 7m Boatlift PDCQATAR Marine supplied and installed a 7m boatlift for the client who had a wrong port for his jet-boat. The boat lift is made from HDPE cubes, rollers system for smooth entry and exit and […]
View details
Ministry of Municipality & Environment- Legtaifiya 4 Marinas
Client: Ministry of Municipality & Environment Notes: Awarded Public Tender Date Completed: June, 2020 Status: Completed West Bay Lagoon 4 Marinas PDCQATAR Marine was contract awarded for the Public Tender in 2019 to supply and install four (4) marinas at West Bay Lagoon area – Legtaifiya. The project was based on HDPE Docks and Docks […]
View details
Marsa Malaz Kempinski – Sand Filling & Reprofiling
Clients: Marsa Malaz Kempsinski Certificate of Completion: 2019/1007 Date: August, 2019 Status: DONE Marsa Malaz Kempinski – Sand Filling & Reprofiling Marsa Malaz Kempinski, the pear similar to all hotels suffers from erosion. Where PDCQATAR Marine supplied the hotel with sand filling and reprofiling to have a smooth beach level. The operation took 4 workday […]
View details
Private Client J. S. Al Jaber – Floating Dock & Boat Lift
Client: A. S. Al Jaber Certificate of Completion: 2019/1009 Date: Sep, 2019 Status: DONE EZ Dock Floating Pontoon & Dry Berth PDCQATAR Marine installed EZDOCK floating pontoon with jet-ski ports and boatlift with two benches and solar deck lights. Moreover, the Australian well known dry berth brand (Air boat lift) was supplied and installed for […]
View details
Private Client A. A. Al Darwish – Floating Dock
Clients: A. A. Al Darwish Certificate of Completion: 2019/1002 Date: Feb, 2019 Status: DONE Private Client – A. A. Al Darwish Overcoming challenges Supplying and installing HDPE floating cube dock and sitting area secured by handrails for a great gathering chill at sunset. This project had a great client’s feedback that leaded to an expansion […]
View details
Qatar Building Company New Floating Dock
Sed ut perspiciatis unde omnis iste nas error sit voluptatem accusantium doloremque laudantium, totam aperiam, eaque ipsa quae ab illo inventore veritatis et quasi architecto. Ut enim ad minima veniam, quis nostrum exercitationem ullam…
View details