Client: Sh. M. F. Al Thani
Certificate of Completion: 2021/1007
Date: EXP May, 2021
Status: Onegoing

Repair, Maintenance & Annual Contract

PDCQATAR Marine was contracted to repair and re-construct damaged concrete marina pillars as well as maintenance and replacement of corroded stiff arms.

In addition to an annual cleaning and maintenance contract

  • 3 concrete pillars
  • 2 Hot dip galvanized steel stiff arms
  • Annual cleaning and maintenance contract

Related Projects

Private Client Sh. M. A. Althani – Repair & Maintenance

Client: Sh. M. A. Al Thani Certificate of Completion: 2020/1005 Date: Mar, 2020 Status: DONE Repair & Maintenance to Dock The Client’s marina suffered many broken and damaged connections. PDCQATAR Marine being the exclusive dealer for EZDock attended to a full repair and maintenance to the floating dock and replace all damaged connections. Related Projects […]

View details
Private Client Sh. M. A. Althani – Repair & Maintenance

Private Client Sh. A. AlThani – Re-Anchor

Client: Sh. A. Al Thani Certificate of Completion: 2018/1003 Date: Nov, 2018 Status: DONE Re-Anchor and Piling PDCQATAR Marine was contracted to re-anchor and pile driving the client’s marina. The client’s marina had damaged anchorage and no piles to the marina at the time of installation. The scope of work was to pile drive 4 […]

View details
Private Client Sh. A. AlThani – Re-Anchor

Lusail Mourjan Marina Re-Anchor

Clients: Mourjan Marinas Certificate of Completion: 2018/1001 Date: July, 2018 Status: DONE Lusail Marina – ReAnchor Placement of deadweight sinkers to re-anchor the commercial marina of Lusail City operated by Mourjan Marinas. 13 deadweights (sinkers) with chains Each 2.5Ton Related Projects Maintenance & Repair Private Client Sh. A. AlThani – Re-Anchor Sed ut perspiciatis unde […]

View details
Lusail Mourjan Marina Re-Anchor

Lusail Mourjan Marina Repair & Maintenance

Clients: Mourjan Marinas Certificate of Completion: 2020/1014 Date: Sep, 2020 Status: DONE Lusail Marina – Repair & Fixation Repair and fix broken major connection in marina finger. PDCQATAR Marine manufactured a custome designed steel structure connection to replace the broken and damaged Aluminum frame. Related Projects Maintenance & Repair Private Client Sh. A. AlThani – […]