



















Client: | Qatar Building Company |
Certificate of Completion: | 2019/1006 |
Date: | Oct, 2019 |
Status: | DONE |
HDPE Floating Dock with Ports & Dry Berths
HDPE Cube Floating Dock was installed north Qatar for a private villa supplied and installed with jet-ski ports and dry berths. The dock in a very challenging geographical area in Qatar with strong wind and waves.
The project was completed with dredging 300m length waterway channel , navigation buoys and sea barrier floaters.
- 30m length Walkway and 1.5m width
- 2 Jetski ports
- 2 Dry berth (air boatlifts)
- Ladder
- Service Pedestal with MEP work
- Handrails and marine rope
- Dredging 300m length waterway channel
- 12 Navigation Buoys
- 220m length sea barrier floaters
- Deck lights
Related projects
Ministry of Culture & Sports – Doha Marine Sports Club – Floating Dock
Clients: Ministry of Culture & Sports Notes: Awarded Tender Date Completed: Exp Apr 21 Status: Ongoing Doha Marine Sports Club Marina PDCQATAR Marine was contract awarded for the Tender 01/2020 to supply and install marinas at Doha Marine Sports Club – West Bay – Katara Beach. The marina consist of 50m walkway & 30m horizontal […]
View details
Private Client I. Aldhaimi – Floating Dock
Client: I. Al Dhaimi Certificate of Completion: 2021/101 Date: Jan, 2021 Status: DONE Floating Dock with Ports and UW Lights The client had the confidence in PDCQATAR Marine to provide a turn-key solution to his small sized beach with pile of rocks blocking his waterway. PDCQATAR Marine had re-construct and shape and the rock piles […]
View details
Private Client A. A. Al Darwish Boat Lift
Client: A. A. Al Darwish Certificate of Completion: 2020/1015 Date: Nov, 2020 Status: DONE Supply & Install a 7m Boatlift PDCQATAR Marine supplied and installed a 7m boat lift for our returned loyal client. The boat lift is made from HDPE cubes, rollers system for smooth entry and exit and manual winch. 7m length boat […]
View details
The St. Regis – Floating Dock Jetty & Gangway
Previous Next Client: The St. Regis Doha Certificate of Completion: 2020/1006 Date: May, 2020 Status: DONE Aluminum Floating Dock & Gangway PDCQATAR Marine supplied and installed for The St. Regis Doha an aluminum floating dock with WPC wood decking and gangway to replace their old floating dock. The floating dock was strengthen with 2 stiff […]
View details
Private Client A. AlThawadi – Boatlift
Client: A. A. Al Thawadi Certificate of Completion: 2020/1017 Date: No, 2020 Status: DONE Supply & Install a 7m Boatlift PDCQATAR Marine supplied and installed a 7m boatlift for the client who had a wrong port for his jet-boat. The boat lift is made from HDPE cubes, rollers system for smooth entry and exit and […]
View details
Ministry of Municipality & Environment- Legtaifiya 4 Marinas
Client: Ministry of Municipality & Environment Notes: Awarded Public Tender Date Completed: June, 2020 Status: Completed West Bay Lagoon 4 Marinas PDCQATAR Marine was contract awarded for the Public Tender in 2019 to supply and install four (4) marinas at West Bay Lagoon area – Legtaifiya. The project was based on HDPE Docks and Docks […]
View details
Private Client J. S. Al Jaber – Floating Dock & Boat Lift
Client: A. S. Al Jaber Certificate of Completion: 2019/1009 Date: Sep, 2019 Status: DONE EZ Dock Floating Pontoon & Dry Berth PDCQATAR Marine installed EZDOCK floating pontoon with jet-ski ports and boatlift with two benches and solar deck lights. Moreover, the Australian well known dry berth brand (Air boat lift) was supplied and installed for […]
View details
Private Client A. A. Al Darwish – Floating Dock
Clients: A. A. Al Darwish Certificate of Completion: 2019/1002 Date: Feb, 2019 Status: DONE Private Client – A. A. Al Darwish Overcoming challenges Supplying and installing HDPE floating cube dock and sitting area secured by handrails for a great gathering chill at sunset. This project had a great client’s feedback that leaded to an expansion […]
View details