






















Client: | Ritz Carlton Doha Hotel |
Notes: | Survey Report & Evalaution |
Date: | July, 2019 |
Status: | DONE |
Surveying, Inspection and Evaluation
Ritz Carlton appointed PDCQATAR Marine to run a full survey for the hotel’s marina and provide them with our professional inspection and survey report with recommendation and evaluation.
The Survey included:
– Piles conditions and corrosion.
– Wood decking condition.
– Sacrificial Marine Zinc Anode and their condition and effectiveness.
– Floating plastics conditions.
– Pedestals conditions and the fact of absence SOS/Emergency Pedestals.
– Marina Fingers conditions and their stability.
– Under marina service wires and connections.
– The marine growth subaquatic organisms such as barnacles, seaweed etc.
– Marina lighting
– Slipway / Ramp
The Survey Report and Evaluation was handed over to the hotel on July 2019
Related projects
Private Client Sh. M. A. Althani – Repair & Maintenance
Client: Sh. M. A. Al Thani Certificate of Completion: 2020/1005 Date: Mar, 2020 Status: DONE Repair & Maintenance to Dock The Client’s marina suffered many broken and damaged connections. PDCQATAR Marine being the exclusive dealer for EZDock attended to a full repair and maintenance to the floating dock and replace all damaged connections. Related Projects […]
View details
Four Seasons Marina – Surveying & Inspection
Previous Next Client: Four Seasons Hotel Doha Notes: Survey Report & Evalaution Date: Jan, 2019 Status: DONE Surveying, Inspection and Evaluation Four Seasons and The operator Mourjan Marinas appointed PDCQATAR Marine to run a full survey for the hotel’s marina and provide them with our professional inspection and survey report with recommendation and evaluation. The […]
View details
Private Client J. Al Jaber – Underwater Cleaning & Maintenance
Client: J. S. Al Jaber Certificate of Completion: 2019/1009 Date: Sep, 2019 Status: DONE Underwater Cleaning and Maintenance PDCQATAR Marine did an underwater cleaning for the client’s marina as well as general maintenance and replaced connection parts to stainless steel for longer durability and strength. Our team and scuba divers completed the underwater marina growth […]
View details
Private Client A. A. AlThawadi – Maintenance & Underwater Cleaning
Client: A. A. Al Thawadi Certificate of Completion: 2020/1016 Date: Nov, 2020 Status: DONE Maintenance & Underwater Cleaning After our inspection and site surveying, supplying the client with a detailed and photo/video documented damages, marine growth and maintenance requirement for his personal floating dock. The client did not hesitate to sign a maintenance and cleaning […]
View details
Lusail Mourjan Marina Re-Anchor
Clients: Mourjan Marinas Certificate of Completion: 2018/1001 Date: July, 2018 Status: DONE Lusail Marina – ReAnchor Placement of deadweight sinkers to re-anchor the commercial marina of Lusail City operated by Mourjan Marinas. 13 deadweights (sinkers) with chains Each 2.5Ton Related Projects Maintenance & Repair Private Client Sh. A. AlThani – Re-Anchor Sed ut perspiciatis unde […]
View details
Lusail Mourjan Marina Repair & Maintenance
Clients: Mourjan Marinas Certificate of Completion: 2020/1014 Date: Sep, 2020 Status: DONE Lusail Marina – Repair & Fixation Repair and fix broken major connection in marina finger. PDCQATAR Marine manufactured a custome designed steel structure connection to replace the broken and damaged Aluminum frame. Related Projects Maintenance & Repair Private Client Sh. A. AlThani – […]
View details