Surveying, Maintenance & Underwater Works
- Home
- service
- surveying & commercial diving
- Surveying, Maintenance & Underwater Works
BROCHURES
Download your Free Report: What every business owner must know
Download Brochures PDFGET A QUOTE
Surveying & Underwater Works
PDCQATAR Marine offer variety of underwater work and commercial diving services, that includes underwater cleaning for hull, ships and structures as well surveying and inspection supported by inspection report, finding and recommendations.
Our underwater works cover:
- Site surveying.
- Underwater inspection.
- Underwater cleaning for hulls, ships, buoys, chains, filters and structures.
- Underwater repair and maintenance.
- Marking and positioning.
- Underwater cutting and welding.
- Pipe laying.
- Supply & install zinc sacrificial anodes.
- Supply, install and maintain dock wave attenuator.
- Piles jacketing and shields.
- Recovery of sunken objects
Why Us?
- Professional service at comparative pricing.
- Detailed and document operations.
- Full knowledge and experience with the local's conditions.
- Adhere to projects time frame.
RELATED PROJECT
Projects in the field
Marriott Doha Marina – Surveying & Inspection
Client: Marriott Doha Hotel Notes: Survey Report & Evalaution Date: Feb, 2021 Status: DONE Surveying, Inspection and Evaluation Marriott Doha Hotel appointed PDCQATAR Marine to run a full survey for the hotel’s marina and provide them with our professional inspection and survey report with recommendation and evaluation. The Survey included: – Piles conditions and corrosion. […]
View details
Ritz Carlton Marina – Surveying & Inspection
Previous Next Client: Ritz Carlton Doha Hotel Notes: Survey Report & Evalaution Date: July, 2019 Status: DONE Surveying, Inspection and Evaluation Ritz Carlton appointed PDCQATAR Marine to run a full survey for the hotel’s marina and provide them with our professional inspection and survey report with recommendation and evaluation. The Survey included: – Piles conditions […]
View details
Private Client J. Al Jaber – Floating Dock
Client: J. S. Al Jaber Certificate of Completion: 2020/1004 Date: March, 2020 Status: DONE Floating Dock – EZDOCK Expansion The client went through full major expansion of his previously installed floating dock by PDCQATAR Marine. The sitting area was enlarged to accommodate more benches and sizable space. Also added several of accessories that added more […]
View details
Private Client M. Abu Issa Re-Anchor
Client: M. Abu Issa Certificate of Completion: 2019/1003 Date: Feb, 2019 Status: DONE Re-Anchor Floating Dock PDCQATAR Marine was contracted to re-anchor the aluminum floating dock with new concrete deadweight sinkers and chains. Deadweight sinkers 1.5ton each Galvanized Steel chains Related Projects Maintenance & Repair / Surveying Private Client Sh. A. AlThani – Re-Anchor Sed […]
View details
Four Seasons Marina – Surveying & Inspection
Previous Next Client: Four Seasons Hotel Doha Notes: Survey Report & Evalaution Date: Jan, 2019 Status: DONE Surveying, Inspection and Evaluation Four Seasons and The operator Mourjan Marinas appointed PDCQATAR Marine to run a full survey for the hotel’s marina and provide them with our professional inspection and survey report with recommendation and evaluation. The […]
View details
Private Client J. Al Jaber – Underwater Cleaning & Maintenance
Client: J. S. Al Jaber Certificate of Completion: 2019/1009 Date: Sep, 2019 Status: DONE Underwater Cleaning and Maintenance PDCQATAR Marine did an underwater cleaning for the client’s marina as well as general maintenance and replaced connection parts to stainless steel for longer durability and strength. Our team and scuba divers completed the underwater marina growth […]
View details
Lusail Mourjan Marina Re-Anchor
Clients: Mourjan Marinas Certificate of Completion: 2018/1001 Date: July, 2018 Status: DONE Lusail Marina – ReAnchor Placement of deadweight sinkers to re-anchor the commercial marina of Lusail City operated by Mourjan Marinas. 13 deadweights (sinkers) with chains Each 2.5Ton Related Projects Maintenance & Repair Private Client Sh. A. AlThani – Re-Anchor Sed ut perspiciatis unde […]
View details
Lusail Mourjan Marina Repair & Maintenance
Clients: Mourjan Marinas Certificate of Completion: 2020/1014 Date: Sep, 2020 Status: DONE Lusail Marina – Repair & Fixation Repair and fix broken major connection in marina finger. PDCQATAR Marine manufactured a custome designed steel structure connection to replace the broken and damaged Aluminum frame. Related Projects Maintenance & Repair Private Client Sh. A. AlThani – […]
View details